# | # |
---|---|
Edirne Çimentaş Inc. | Klinker Storage Area 150 tons Steel Construction Installation and Facing Works |
Isparta GÖLTAŞ Cement Factory | 160 Tons Steel Construction Manufacturing |
Prekons Inc. | Petrofac Kazakistan 1800 Tons Steel Construction Manufacturing |
İZKA Yıldırım Beyazıt Univesity Underground Piping Works | Heating and Cooling systems (13.000 Dia Inches) |
İZKA Uşak TOKİ Underground Piping Works | Heating and Cooling systems (6.000 Dia Inches) |
TEKFEN Eskişehir TANAP Camping site Underground Piping Works | Heating and Cooling systems (7.000 Dia Inches) |
890 MWe OMV Samsun CCPP Power Plant Quality Control Works | On Behalf Of Bureau Veritas Consultancy Co |
80 MWe Geothermal Power Plant Quality Control Works (Fuji & TAS) | On Behalf Of Bureau Veritas Consultancy Co |
80 MWe Geothermal Power Plant Quality Control Works (SPX Cooling Tower) | On Behalf Of Bureau Veritas Consultancy Co |
24 MWe Geothermal Power Plant Quality Control Works (Ormat Technologies Inc.) | On Behalf Of Bureau Veritas Consultancy Co. |
TANAP Pipeline Project Quality Control Works | On Behalf Of Bureau Veritas Consultancy Co. |
Albayrak Group Varaka Factory Project Quality Control Works | On Behalf Of Bureau Veritas Consultancy Co |
Mavi Bayrak Enerji Biomass Power Plant Project Quality Control Works | On Behalf Of Bureau Veritas Consultancy Co. |
Erzincan ANAGOLD Mining Quality Control Works | On Behalf Of Applus Velosi Co. |
Star Rafinery Quality Control Works | On Behalf Of Applus Velosi Co. |
40 MWe Wind Farm Power Plant Quality Control Works (Nordex SE) | On Behalf Of Bureau Veritas Consultancy Co. |
Ufuk Üniversitesi Cad. No:3 The Paragon Kat:23 06510 Çukurambar / Ankara
+90 [312] 220 22 50 | +90 [312] 220 22 51 | info@raneri.com.tr
Weekdays : 09:00 - 18:00 Saturday : 09:00 - 14:00