REFERENCES

# #
Edirne Çimentaş Inc. Klinker Storage Area 150 tons Steel Construction Installation and Facing Works
Isparta GÖLTAŞ Cement Factory 160 Tons Steel Construction Manufacturing
Prekons Inc. Petrofac Kazakistan 1800 Tons Steel Construction Manufacturing
İZKA Yıldırım Beyazıt Univesity Underground Piping Works Heating and Cooling systems (13.000 Dia Inches)
İZKA Uşak TOKİ Underground Piping Works Heating and Cooling systems (6.000 Dia Inches)
TEKFEN Eskişehir TANAP Camping site Underground Piping Works Heating and Cooling systems (7.000 Dia Inches)
890 MWe OMV Samsun CCPP Power Plant Quality Control Works On Behalf Of Bureau Veritas Consultancy Co
80 MWe Geothermal Power Plant Quality Control Works (Fuji & TAS) On Behalf Of Bureau Veritas Consultancy Co
80 MWe Geothermal Power Plant Quality Control Works (SPX Cooling Tower) On Behalf Of Bureau Veritas Consultancy Co
24 MWe Geothermal Power Plant Quality Control Works (Ormat Technologies Inc.) On Behalf Of Bureau Veritas Consultancy Co.
TANAP Pipeline Project Quality Control Works On Behalf Of Bureau Veritas Consultancy Co.
Albayrak Group Varaka Factory Project Quality Control Works On Behalf Of Bureau Veritas Consultancy Co
Mavi Bayrak Enerji Biomass Power Plant Project Quality Control Works On Behalf Of Bureau Veritas Consultancy Co.
Erzincan ANAGOLD Mining Quality Control Works On Behalf Of Applus Velosi Co.
Star Rafinery Quality Control Works On Behalf Of Applus Velosi Co.
40 MWe Wind Farm Power Plant Quality Control Works (Nordex SE) On Behalf Of Bureau Veritas Consultancy Co.
Be informed
Social Media

Copyright © 2025 | Raneri | All Rights Reserved. | Design By Cogen® Yazılım, Ankara Web Tasarım